SPB-PC

August 2022

Shree Cements Limited

Engineering and consultancy services, procurement assistance, project management services and assistance in construction management for installation of 2 x 18 MW TG set and along with 2 x 80 tph boiler for captive power generation (2003)Techno-economic feasibility report for installation of a 6 MW Power plant at Shree Power (for RAS cement operation) (2004)Techno-economic feasibility …

Shree Cements Limited Read More »

NEPA Limited

Assistance in updating project cost estimates for a large-sized newsprint project (1989)Preparation of project report and assistance in mobilization of finance for establishment of a 88,000 tpa newsprint mill (1989)Technical audit and mill rehabilitation and development study of 88,000 tpa bamboo/wood based newsprint mill (1995)

Mysore Paper Mills

Technical audit and mill development study of 120,000 tpa writing and printing and newsprint mill (1995)Technical study for producing writing and printing grades pulp in CSRMP mil for use in newsprint machine (2004)

JK Corp Limited

Rapid EIA study in connection with the expansion of the mill from 75,500 tpa to 160,000 tpa (1996)Technical and engineering services including project management for mill expansion-cum-modernisation programme (120,000 tpa), involving design engineering for India’s first ECF pulp mill (1998)Parallel operation of 12 MW and 5.5 MW turbo generator set integrating with pressure reducing station …

JK Corp Limited Read More »

ITC Bhadrachalam Paperboards Limited

Techno-economic feasibility report for mill development programme (2000) Techno-economic feasibility report for installation of new turbo alternator (2001) Techno-economic feasibility report for installation of paper machine #5. (2001) Detail engineering services for rebuild of paper machine #1 incorporating “On-Machine” coating facilities (2001) Engineering services for installation of electrostatic precipitator for coal fired boiler #3 (2001) …

ITC Bhadrachalam Paperboards Limited Read More »