Techno-economic feasibility report for mill development programme (2000)
Techno-economic feasibility report for installation of new turbo alternator (2001)
Techno-economic feasibility report for installation of paper machine #5. (2001)
Detail engineering services for rebuild of paper machine #1 incorporating “On-Machine” coating facilities (2001)
Engineering services for installation of electrostatic precipitator for coal fired boiler #3 (2001)
Design, engineering and project management services for installation of a pulp sheeting machine. (2003)
Techno-economic feasibility report for technology upgradation and modernization of existing pulp mill (2003)
Technical due diligence study of BILT Industrial Packaging Company Limited (2003)
Techno-economic feasibility report for Project “Lotus” – Installation of a new pulp mill (2004)
Design, engineering and project management services for installation of a 75,000 tpa multi-layer board machine (2004)
Techno-economic feasibility report for capacity enhancement of METSO fibre line (2005)
Report on opportunity study for establishment of pulp and paper mills in the States of Maharashtra and Madhya Pradesh (2005)
Techno-economic feasibility report for installation of a new cooking system of 250,000 tpa and a new fibre line of 120,000 tpa with chemical recovery island (2005)
Detail engineering services for installation of a size press and connected auxiliaries and accessories for PM #5 (2005)
Project consultancy services for augmentation of stock preparation system and the multi-layer board machine by installing deinking facilities at Dakshin Unit. (2005)
Project engineering and technology upgradation programme for modernisation of chipper house and recausticising plant (Ongoing)
Techno-economic feasibility report for capacity expansion by installing a multi-layer board P&W paper machine (PM 6) (Ongoing)
Design and engineering services and project management services for pulp mill and chemical recovery areas under expansion and modernization programme which incorporates ECF bleaching (Ongoing)
Rapid EIA study in connection with the following
– Expansion of the mill to 100,000 tpa production (2001)
– Expansion of existing pulp mill – Project “Lotus” (2004)
– Co-generation facilities at BIPCO (2004)
– Proposed new 100,000 tpa pulp mill (On going)