Concept to commissioning of first expansion and diversification programme, for increasing the capacity from 20,000 tpa to 35,000 tpa and diversifying the product range to include duplex board, light weight posters etc (1969)

Concept to commissioning of second expansion programme for increasing the capacity from 35,000 tpa to 55,000 tpa (1977)

Identification and selection of second-hand boiler and turbo generator and total responsibility for dismantling, transportation, erection and commissioning including engineering services for utilities (1990)

Technical audit and mill development study of 55,000 tpa integrated pulp and paper mill (1992)

Techno-economic feasibility report for mill expansion-and-modernisation (1995)

Rapid EIA study in connection with expansion of the mill from 60,000 to 120,000 tpa (1995)

Inspection of second hand boiler and turbo generator set at Begium and Germany (1997)

Project consultancy and engineering services for expansion project, including detail engineering for a high speed refurbished paper machine to increase the capacity from 55,000 tpa to 115,000 tpa (2000)

Techno-economic feasibility report for installation of a 20 MW Captive Power Plant (2003)

Techno-economic feasibility report for installation of 20 MW captive power plant (2003)

Design, engineering and project management services for installation of a 20 MW captive power plant (2005)

Project consultancy and engineering services for implementation of mill development plan involving 350 tpd pulp mill with ECF bleaching, chemical recovery system and 16 MW captive power plant (Ongoing)

Rapid EIA in connection with expansion-cum-modernisation of the mill (ongoing)