  • Techno-economic feasibility report for installation of a 250 tpd paper machine and pulping facilities with required auxiliaries and utilities
    Technical audit and mill development study for capacity expansion and technology upgradation of a 35,000 tpa agro-based paper mill (2003)
  • Rapid EIA study in connection with expansion of the mill to 200 tpd production (2004)
  • Engineering and consultancy services for installation of 2 x 20 MW captive power plant (ongoing)
  • Design, engineering and project management services for implementation of Mill Development Plan covering all areas commencing from raw materials preparation up to and including installation of a new paper machine as well as necessary utilities and auxiliaries (on going)
  • Techno-economic feasibility study of a large size sugar-cum-paper complex (1988)
  • Detailed analysis and submission of recommendations for modification of the existing wood pulping line to process bagasse pulp (1988)
    Technical audit and mill development study of a 80,000 tpa integrated pulp and paper mill (1990)
  • Assistance in the development of a proposal for revival/rehabilitation of a 40,000 tpa integrated pulp and paper mill (1990)
  • Revival/rehabilitation of Kerasinter Ltd – a 13,200 tpa ceramic tiles unit (1991)
  • Procurement assistance in mill modernization of chemical recovery, pulp mill and paper machines for a 85,000 tpa integrated pulp and paper mill (1993)
  • Technical and engineering services including project management for mill expansion project (1994)
  • Preparation of a detailed project report for mill development plan (1998)
  • Safety audit and recommendations for recommencement of digester operation (2001)
  • Techno-economic feasibility report for integration of APPM and CPM in association with Amec Simons, Canada (2002)
  • Rapid EIA study in connection with expansion and modernization of the mill (2004)
  • Complete design and detail engineering and project management services for implementation of expansion scheme involving, inter alias, the largest single line ECF pulp mill in the country (ongoing)
  • Engineering and consultancy services for installation of a 34MW TG set (ongoing)
  • Techno-economic feasibility study for establishment of an integrated sugar-cum-paper unit at Choudwar, Orissa (1996)
  • Study on water conservation for Shree Gopal unit and Ballarshah unit (2000)
  • Snap appraisal study of Ballarpur and BGPL units of BILT (2002)
  • Techno-economic feasibility report for expansion of BILT Ballarshah unit and BILT Graphics unit in association with Jaakko Poyry Consulting, Finland (2005)
  • Review of captive power plant and asset valuation of BILT units (2005)
  • Engineering for a new paper machine
  • Techno-economic feasibility report for mill expansion-and-modernisation (1996)
  • Techno-economic feasibility report for establishment of a captive bagasse pulp line (1992)
  • Technical audit and de-bottlenecking study of a 100,000 tpa bagasse-based paper plant (1998)
  • Technical audit and mill development study of 7200 tpa fine paper mill based on straw and grass (1995)
  • Techno-economic feasibility study for installation of a captive co-generation power plant (1998)
  • Energy audit (1999)
  • Installation of 6 MW TG set along with 35 tph AFBC boiler for the new co-generation plant (2001)
  • Engineering and consultancy services, procurement assistance, project management services and assistance in construction management for installation of a 35 tph FBC boiler and 5 MW turbo alternator for captive co-generation power plant (2001)
  • Techno-economic feasibility study for expansion/diversification into industrial sector (2004)
  • Techno-economic feasibility report for expansion of the mill by installing a newsprint machine (2005)
  • Rapid EIA study in connection with the proposed paper machine #3 and power plant of the mill (ongoing)
  • Project engineering and technical services for implementation of mill development plan involving installation of a paper machine (PM#3), fibre preparation and utilities (ongoing)
  • Project Management and Engineering services and marketing assistance for a 6000 tpa sanitary ware unit (1989)
  • Techno-economic feasibility study for establishment of a large size bagasse based paper mill (1986)
  • Sector study of pulp and paper industry in India with a view to identify problems and constraints faced by the industry and evolve appropriate remedial measures for consideration of Government of India, besides development of long-term strategy for the growth of the industry, in future (1986)
  • Extension of sector study for pulp and paper industry to examine, in particular, the viability of integrated paper/newsprint-cum-sugar mills (1986)
  • Techno-economic feasibility study of a new Security Paper Mill and assessment of post-implementation operations of modernization schemes of an existing mill (1988)
  • Integrated market study and techno-economic feasibility study for the establishment of a Medium Density Fibre Board Plant for Tamil Nadu Industrial Development Corporation (1989)
  • Techno-economic appraisal of a 40 tpd duplex board project of Saraswati Udyog Limited for Tamil Nadu Industrial Development Corporation (1998)
  • Provision of consultancy services for implementation of cogeneration power plant consisting of 1 x 80 tph bagasse/lignite fire boiler along with 1 x 4.5 MW turbo generator set and 15 MW tubro generator set for Tamil Nadu Sugar Corporation Limited (1998)
  • Techno-economic feasibility study for establishment of a large size bagasse based newsprint/fine paper mill (1986)
  • Comprehensive market survey for estimating potential for Black Clawson products, as applicable to Indian Pulp and Paper Industries (1989)
  • Technical audit and mill development study of 80,000 tpa newsprint mill (unit Kottayam) (1994)
  • Technical audit and mill development study of two units each 80,000 tpa bamboo based fine paper mill (Units Nagaon and Cachar) (1995)
  • Revival/rehabilitation study of a 50,000 tpa integrated pulp and paper mill (Unit Punalur Paper Mills) (1995)
  • Consultancy for preparation for detailed project report for deinking plant of 100 tpd at Kottayam (1998)
  • Engineering and consultancy services, procurement assistance, project management services and assistance in construction management for installation of a new recovery boiler (1998)
  • Engineering and consultancy services for introduction of a new high consistency hydrogen peroxide bleaching system in chemi-mechanical pulping line. (On-hold)
  • Techno-commercial feasibility study of a 71,000 tpa newsprint and P&W paper mill in Surat district, Gujarat (1999)
  • Techno-commercial feasibility study of a 71,000 tpa newsprint and P&W paper mill in Surat district, Gujarat (1999)
  • Techno-economic feasibility study including market survey for establishment of a sugar-cum-newsprint/printing and writing paper mill with a capacity of 5000 tcd of cane crushing and upto 170,000 tpa of newsprint/printing and writing paper (1994)
  • Laboratory testing and evaluation of newsprint/fine paper making characteristics of bagasse from Uttar Pradesh (1995)
  • Rapid EIA study for the establishment of a sugar-cum-newsprint/printing and writing paper mill with a capacity of 5000 tcd of cane crushing and up to 170,000 tpa of newsprint/printing and writing paper (1995)
  • Techno-economic feasibility report for mill development programme (2000)
  • Techno-economic feasibility report for installation of new turbo alternator (2001)
  • Techno-economic feasibility report for installation of paper machine #5. (2001)
  • Detail engineering services for rebuild of paper machine #1 incorporating “On-Machine” coating facilities (2001)
  • Engineering services for installation of electrostatic precipitator for coal fired boiler #3 (2001)
  • Design, engineering and project management services for installation of a pulp sheeting machine. (2003)
  • Techno-economic feasibility report for technology upgradation and modernization of existing pulp mill (2003)
  • Technical due diligence study of BILT Industrial Packaging Company Limited (2003)
  • Techno-economic feasibility report for Project “Lotus” – Installation of a new pulp mill (2004)
  • Design, engineering and project management services for installation of a 75,000 tpa multi-layer board machine (2004)
  • Techno-economic feasibility report for capacity enhancement of METSO fibre line (2005)
  • Report on opportunity study for establishment of pulp and paper mills in the States of Maharashtra and Madhya Pradesh (2005)
  • Techno-economic feasibility report for installation of a new cooking system of 250,000 tpa and a new fibre line of 120,000 tpa with chemical recovery island (2005)
  • Detail engineering services for installation of a size press and connected auxiliaries and accessories for PM #5 (2005)
  • Project consultancy services for augmentation of stock preparation system and the multi-layer board machine by installing deinking facilities at Dakshin Unit. (2005)
  • Project engineering and technology upgradation programme for modernisation of chipper house and recausticising plant (Ongoing)
  • Techno-economic feasibility report for capacity expansion by installing a multi-layer board P&W paper machine (PM 6) (Ongoing)
  • Design and engineering services and project management services for pulp mill and chemical recovery areas under expansion and modernization programme which incorporates ECF bleaching (Ongoing)
  • Rapid EIA study in connection with the following
  • – Expansion of the mill to 100,000 tpa production (2001)
    – Expansion of existing pulp mill – Project “Lotus” (2004)
    – Co-generation facilities at BIPCO (2004)
    – Proposed new 100,000 tpa pulp mill (On going)
  • Rapid EIA study in connection with the expansion of the mill from 75,500 tpa to 160,000 tpa (1996)
  • Technical and engineering services including project management for mill expansion-cum-modernisation programme (120,000 tpa), involving design engineering for India’s first ECF pulp mill (1998)
  • Parallel operation of 12 MW and 5.5 MW turbo generator set integrating with pressure reducing station (1998)
  • Detail engineering and technical consultancy services for installation of a second-hand duplex board machine at Central Pulp Mills, Gujarat (On-going)
  • Technical audit and mill development study of 120,000 tpa writing and printing and newsprint mill (1995)
  • Technical study for producing writing and printing grades pulp in CSRMP mil for use in newsprint machine (2004)
  • Assistance in updating project cost estimates for a large-sized newsprint project (1989)
  • Preparation of project report and assistance in mobilization of finance for establishment of a 88,000 tpa newsprint mill (1989)
  • Technical audit and mill rehabilitation and development study of 88,000 tpa bamboo/wood based newsprint mill (1995)
  • Concept to commissioning of a 1,500 tcd capacity sugar mill (1984)
  • Techno-economic feasibility study of a co-generation system (1988)
  • Installation of a 3 MW co-generation system along with a boiler (1992)
  • Project consultancy services for the establishment of a sugar mill in Orissa with a capacity of 2,500 tcd expandable to 3,500 tcd (1994)
  • Techno-economic feasibility study for a co-generation project (On going)
  • Techno-commercial-cum-market appraisal of expansion of Khanna Paper Mills Limited (2000)
  • Concept to commissioning of first expansion and diversification programme, for increasing the capacity from 20,000 tpa to 35,000 tpa and diversifying the product range to include duplex board, light weight posters etc (1969)
  • Concept to commissioning of second expansion programme for increasing the capacity from 35,000 tpa to 55,000 tpa (1977)
  • Identification and selection of second-hand boiler and turbo generator and total responsibility for dismantling, transportation, erection and commissioning including engineering services for utilities (1990)
  • Technical audit and mill development study of 55,000 tpa integrated pulp and paper mill (1992)
  • Techno-economic feasibility report for mill expansion-and-modernisation (1995)
  • Rapid EIA study in connection with expansion of the mill from 60,000 to 120,000 tpa (1995)
  • Inspection of second hand boiler and turbo generator set at Begium and Germany (1997)
  • Project consultancy and engineering services for expansion project, including detail engineering for a high speed refurbished paper machine to increase the capacity from 55,000 tpa to 115,000 tpa (2000)
  • Techno-economic feasibility report for installation of a 20 MW Captive Power Plant (2003)
  • Techno-economic feasibility report for installation of 20 MW captive power plant (2003)
  • Design, engineering and project management services for installation of a 20 MW captive power plant (2005)
  • Project consultancy and engineering services for implementation of mill development plan involving 350 tpd pulp mill with ECF bleaching, chemical recovery system and 16 MW captive power plant (Ongoing)
  • Rapid EIA in connection with expansion-cum-modernisation of the mill (ongoing)
  • Engineering and consultancy services, procurement assistance, project management services and assistance in construction management for installation of 2 x 18 MW TG set and along with 2 x 80 tph boiler for captive power generation (2003)
  • Techno-economic feasibility report for installation of a 6 MW Power plant at Shree Power (for RAS cement operation) (2004)
  • Techno-economic feasibility report for installation of a 2 x 18 MW captive power plant at Bangur Cement Plant RAS, (2005)
  • Engineering and consultancy services for installation of 1 x 18 MW TG set and along with 1 x 85 tph boiler for captive power plant (Ongoing)
  • Rapid EIA Study for establishment of a 200,000 tpa paper mill to produce specialty papers, coated papers and coated boards (1995)
  • Project consultancy services including basic and detail engineering for the establishment of a 200,000 tpa paper mill to produce speciality papers, coated papers and coated boards (1996)
  • Techno-economic feasibility study for the Establishment of a captive bagasse pulp mill (1991)
  • Technical audit and consultancy services of a 50,000 tpa integrated pulp and paper mill (1991)
  • Techno-economic feasibility report for installation of co-generation plant (1995)
  • Design, engineering and consultancy services for renovation and modernisation of a 50,000 tpa integrated pulp and paper mill (1996)
  • Mill optimisation and development plan (1998)
  • Concept to commissioning of this mill in a record time frame of 36 months from finance tie-up (1981-1984)
  • Identification of international R&D facilities; structuring, co-ordinating and reporting on the R&D programme for production of mechanical bagasse pulp and its use in manufacture of newsprint (R&D trials conducted by Beloit Corporation, USA and Enso Gutzeit, Finland) (1982)
  • Training of operating personnel (including laboratory chemist/technicians) for 100,000 tpa bagasse based newsprint and fine paper mill (1984)
  • Installation of a 1 x 18 MW turbo generator sets along with 3 x 60 tph ignifluid boilers – Phase I (1984)
  • Research on bio-technological applications in paper industry. Besides general applications the research effort focused on preservation of bagasse during storage, wastewater treatment and slime-control (1987)
  • Techno-economic feasibility report for establishment of a large seized bagasse based newsprint/fine paper mill (Unit # 2) in Tamil Nadu (1995)
  • Basic engineering support for Vision Finance and Leasing Ltd, Mumbai for their 125,000 tpa paper project (1995)
  • Design, engineering, technical services and project management services for expansion of the integrated pulp and paper mill from 90,000 tpa to 180,000 tpa (1996)
  • Installation of a 1 x 10.5 MW turbo generator sets along with 1 x 60 tph AFBC boiler for the expansion of the mill hooking up the existing system – Phase II (1996)
  • Technical audit and mill development study of a 180,000 tpa composite mill (1997)
  • Analysis of catastrophe failure of the turbine, at one of their c-operative sugar mills (1998)
  • Detail engineering services for installation of wet lap machine (1999)
  • Review of various combustion system and selection of combustion system for firing solid fuels viz., coal, lignite, Australian/China coal (2001)
  • Installation of 24.62 MW TG set along with 1 x 90 tph AFBC boiler for new cogeneration plant (2001)
  • Rapid EIA study in connection with the following:
    – Expansion of the mill from 90,000 tpa to 180,00 tpa
    – Expansion of the mill to 240,000 tpa
  • Basic and detail engineering services for installation of 90 tph FBC boiler and Turbo generator for co-generation of power (2001)
  • Due diligence study of Thai Pulp and Paper Industries in association with Amec, Simons, Canada (2001)
  • Techno-economic feasibility report for the expansion of mill under Mill Development Plan (2004)
  • Engineering and consultancy services for installation of 20 MW TG set (Oongoing)
  • Engineering of ECF bagasse and wood pulp mill (On going)
  • Techno-economic feasibility study for Paper Machine #3 (On going)
  • Project evaluation study of Titagarh Paper Mill Unit 1 (2001)
  • Techno-economic feasibility study for the establishment of a captive bagasse pulp mill (1992)
  • Study on water conservation (2004)
  • Detailed project report concerning capacity expansion-cum-technology up gradation of the mill (ongoing)
  • Rapid EIA Study for capacity expansion-cum-technology upgradation of the mill (ongoing)