With
in India
|
Abhishek
Industries Ltd, Paper Division
Techno-economic feasibility
report for installation of a 250 tpd paper machine
and pulping facilities with required auxiliaries
and utilities
Technical audit and mill development
study for capacity expansion and technology
upgradation of a 35,000 tpa agro-based paper
mill (2003)
Rapid EIA study in connection
with expansion of the mill to 200 tpd production
(2004)
Engineering and consultancy
services for installation of 2 x 20 MW captive
power plant (ongoing)
Design, engineering and project management services
for implementation of Mill Development Plan
covering all areas commencing from raw materials
preparation up to and including installation
of a new paper machine as well as necessary
utilities and auxiliaries (on going)
|
|
|
Andhra
Pradesh Industrial Development Corporation
Techno-economic feasibility study of a large
size sugar-cum-paper complex (1988)
|
|
|
Andhra
Pradesh Paper Mills Limited
Detailed analysis and submission of recommendations
for modification of the existing wood pulping
line to process bagasse pulp (1988)
Technical audit and mill development study
of a 80,000 tpa integrated pulp and paper
mill (1990)
Assistance in the development of a proposal
for revival/rehabilitation of a 40,000 tpa
integrated pulp and paper mill (1990)
Revival/rehabilitation of Kerasinter Ltd
– a 13,200 tpa ceramic tiles unit (1991)
Procurement assistance in mill modernization
of chemical recovery, pulp mill and paper
machines for a 85,000 tpa integrated pulp
and paper mill (1993)
Technical and engineering services including
project management for mill expansion project
(1994)
Preparation of a detailed project report
for mill development plan (1998)
Safety audit and recommendations for recommencement
of digester operation (2001)
Techno-economic feasibility report for integration
of APPM and CPM in association with Amec Simons,
Canada (2002)
Rapid EIA study in connection with expansion
and modernization of the mill (2004)
Complete design and detail engineering and
project management services for implementation
of expansion scheme involving, inter alias,
the largest single line ECF pulp mill in the
country (ongoing)
Engineering and consultancy services for
installation of a 34MW TG set (ongoing)
|
|
|
|
Ballarpur Industries
Limited
Techno-economic feasibility study for establishment
of an integrated sugar-cum-paper unit at Choudwar,
Orissa (1996)
Study on water conservation for Shree Gopal
unit and Ballarshah unit (2000)
Snap appraisal study of Ballarpur and BGPL
units of BILT (2002)
Techno-economic feasibility report for expansion
of BILT-Ballarshah unit and BILT Graphics
unit in association with Jaakko Poyry Consulting,
Finland (2005)
Review of captive power plant and asset valuation
of BILT units (2005)
Engineering for a new paper machine
|
|
|
|
Central Pulp
and Paper
Techno-economic feasibility report for mill
expansion-and-modernisation (1996)
|
|
|
|
Century Pulp
& Paper Mills Limited
Techno-economic feasibility report for establishment
of a captive bagasse pulp line (1992)
Technical audit and de-bottlenecking study
of a 100,000 tpa bagasse-based paper plant
(1998)
|
|
|
|
Emami Paper
Mills
Technical audit and mill development study
of 7200 tpa fine paper mill based on straw
and grass (1995)
Techno-economic feasibility study for installation
of a captive co-generation power plant (1998)
Energy audit (1999)
Installation of 6 MW TG set along with 35
tph AFBC boiler for the new co-generation
plant (2001)
Engineering and consultancy services, procurement
assistance, project management services and
assistance in construction management for
installation of a 35 tph FBC boiler and 5
MW turbo alternator for captive co-generation
power plant (2001)
Techno-economic feasibility study for expansion/diversification
into industrial sector (2004)
Techno-economic feasibility report for expansion
of the mill by installing a newsprint machine
(2005)
Rapid EIA study in connection with the proposed
paper machine #3 and power plant of the mill
(ongoing)
Project engineering and technical services
for implementation of mill development plan
involving installation of a paper machine
(PM#3), fibre preparation and utilities (ongoing)
|
|
|
|
GMB Ceramics
Limited
Project Management and Engineering services
and marketing assistance for a 6000 tpa sanitary
ware unit (1989)
|
|
|
|
Government
of Bihar, Industrial Department
Techno-economic feasibility
study for establishment of a large size bagasse
based paper mill (1986)
|
|
|
|
Government
of India
Sector study of pulp and paper industry in
India with a view to identify problems and
constraints faced by the industry and evolve
appropriate remedial measures for consideration
of Government of India, besides development
of long-term strategy for the growth of the
industry, in future (1986)
Extension of sector study for pulp and paper
industry to examine, in particular, the viability
of integrated paper/newsprint-cum-sugar mills
(1986)
Techno-economic feasibility study of a new
Security Paper Mill and assessment of post-implementation
operations of modernization schemes of an
existing mill (1988)
|
|
|
|
Government
of Tamil Nadu
Integrated market study and techno-economic
feasibility study for the establishment of
a Medium Density Fibre Board Plant for Tamil
Nadu Industrial Development Corporation (1989)
Techno-economic appraisal of a 40 tpd duplex
board project of Saraswati Udyog Limited for
Tamil Nadu Industrial Development Corporation
(1998)
Provision of consultancy services for implementation
of cogeneration power plant consisting of
1 x 80 tph bagasse/lignite fire boiler along
with 1 x 4.5 MW turbo generator set and 15
MW tubro generator set for Tamil Nadu Sugar
Corporation Limited (1998)
|
|
|
|
Gujarat Industrial
Investment Corporation
Techno-economic feasibility study for establishment
of a large size bagasse based newsprint/fine
paper mill (1986)
|
|
|
|
Hindustan Dorr-Oliver
Limited
Comprehensive market survey for estimating
potential for Black Clawson products, as applicable
to Indian Pulp and Paper Industries (1989)
|
|
|
|
Hindustan Newsprint
Limited, Kottayam
Technical audit and mill development study
of 80,000 tpa newsprint mill (unit Kottayam)
(1994)
Technical audit and mill development study
of two units each 80,000 tpa bamboo based
fine paper mill (Units Nagaon and Cachar)
(1995)
Revival/rehabilitation study of a 50,000
tpa integrated pulp and paper mill (Unit Punalur
Paper Mills) (1995)
Consultancy for preparation for detailed
project report for deinking plant of 100 tpd
at Kottayam (1998)
Engineering and consultancy services, procurement
assistance, project management services and
assistance in construction management for
installation of a new recovery boiler (1998)
Engineering and consultancy services for
introduction of a new high consistency hydrogen
peroxide bleaching system in chemi-mechanical
pulping line. (On-hold)
|
|
|
|
ICICI
Techno-commercial feasibility study of a 71,000
tpa newsprint and P&W paper mill in Surat
district, Gujarat (1999)
|
|
|
|
IDBI
Pre-investment study in paper industries under
EMCAT project (1995)
|
|
|
|
Indogulf Fertilizers
& Chemicals Corpn Ltd
Techno-economic feasibility study including
market survey for establishment of a sugar-cum-newsprint/printing
and writing paper mill with a capacity of
5000 tcd of cane crushing and upto 170,000
tpa of newsprint/printing and writing paper
(1994)
Laboratory testing and evaluation of newsprint/fine
paper making characteristics of bagasse from
Uttar Pradesh (1995)
Rapid EIA study for the establishment of
a sugar-cum-newsprint/printing and writing
paper mill with a capacity of 5000 tcd of
cane crushing and up to 170,000 tpa of newsprint/printing
and writing paper (1995)
|
|
|
|
ITC Bhadrachalam
Paperboards Limited
Techno-economic feasibility report for mill
development programme (2000)
Techno-economic feasibility report for installation
of new turbo alternator (2001)
Techno-economic feasibility report for installation
of paper machine #5. (2001)
Detail engineering services for rebuild of
paper machine #1 incorporating “On-Machine”
coating facilities (2001)
Engineering services for installation of
electrostatic precipitator for coal fired
boiler #3 (2001)
Design, engineering and project management
services for installation of a pulp sheeting
machine. (2003)
Techno-economic feasibility report for technology
upgradation and modernization of existing
pulp mill (2003)
Technical due diligence study of BILT Industrial
Packaging Company Limited (2003)
Techno-economic feasibility report for Project
“Lotus” – Installation of
a new pulp mill (2004)
Design, engineering and project management
services for installation of a 75,000 tpa
multi-layer board machine (2004)
Techno-economic feasibility report for capacity
enhancement of METSO fibre line (2005)
Report on opportunity study for establishment
of pulp and paper mills in the States of Maharashtra
and Madhya Pradesh (2005)
Techno-economic feasibility report for installation
of a new cooking system of 250,000 tpa and
a new fibre line of 120,000 tpa with chemical
recovery island (2005)
Detail engineering services for installation
of a size press and connected auxiliaries
and accessories for PM #5 (2005)
Project consultancy services for augmentation
of stock preparation system and the multi-layer
board machine by installing deinking facilities
at Dakshin Unit. (2005)
Project engineering and technology upgradation
programme for modernisation of chipper house
and recausticising plant (Ongoing)
Techno-economic feasibility report for capacity
expansion by installing a multi-layer board
P&W paper machine (PM 6) (Ongoing)
Design and engineering services and project
management services for pulp mill and chemical
recovery areas under expansion and modernization
programme which incorporates ECF bleaching
(Ongoing)
Rapid EIA study in connection with the following
- Expansion of the mill to 100,000 tpa production
(2001)
- Expansion of existing pulp mill –
Project “Lotus” (2004)
- Co-generation facilities at BIPCO (2004)
- Proposed new 100,000 tpa pulp mill (On going)
|
|
|
|
JK Corp Limited
Rapid EIA study in connection with the expansion
of the mill from 75,500 tpa to 160,000 tpa
(1996)
Technical and engineering services including
project management for mill expansion-cum-modernisation
programme (120,000 tpa), involving design
engineering for India’s first ECF pulp
mill (1998)
Parallel operation of 12 MW and 5.5 MW turbo
generator set integrating with pressure reducing
station (1998)
Detail engineering and technical consultancy
services for installation of a second-hand
duplex board machine at Central Pulp Mills,
Gujarat (On-going)
|
|
|
|
Mysore Paper
Mills
Technical audit and mill development study
of 120,000 tpa writing and printing and newsprint
mill (1995)
Technical study for producing writing and
printing grades pulp in CSRMP mil for use
in newsprint machine (2004)
|
|
|
|
NEPA Limited
Assistance in updating project cost estimates
for a large-sized newsprint project (1989)
Preparation of project report and assistance
in mobilization of finance for establishment
of a 88,000 tpa newsprint mill (1989)
Technical audit and mill rehabilitation and
development study of 88,000 tpa bamboo/wood
based newsprint mill (1995)
|
|
|
|
Ponni Sugars
and Chemicals Limited
Concept to commissioning of
a 1,500 tcd capacity sugar mill (1984)
Techno-economic feasibility study of a co-generation
system (1988)
Installation of a 3 MW co-generation system
along with a boiler (1992)
Project consultancy services for the establishment
of a sugar mill in Orissa with a capacity
of 2,500 tcd expandable to 3,500 tcd (1994)
Techno-economic feasibility
study for a co-generation project (On going)
|
|
|
|
SBI Capital
Markets Limited
Techno-commercial-cum-market appraisal of
expansion of Khanna Paper Mills Limited (2000)
|
|
|
|
Seshasayee
Paper and Boards Limited
Concept to commissioning of first expansion
and diversification programme, for increasing
the capacity from 20,000 tpa to 35,000 tpa
and diversifying the product range to include
duplex board, light weight posters etc (1969)
Concept to commissioning of second expansion
programme for increasing the capacity from
35,000 tpa to 55,000 tpa (1977)
Identification and selection of second-hand
boiler and turbo generator and total responsibility
for dismantling, transportation, erection
and commissioning including engineering services
for utilities (1990)
Technical audit and mill development study
of 55,000 tpa integrated pulp and paper mill
(1992)
Techno-economic feasibility report for mill
expansion-and-modernisation (1995)
Rapid EIA study in connection with expansion
of the mill from 60,000 to 120,000 tpa (1995)
Inspection of second hand boiler and turbo
generator set at Begium and Germany (1997)
Project consultancy and engineering services
for expansion project, including detail engineering
for a high speed refurbished paper machine
to increase the capacity from 55,000 tpa to
115,000 tpa (2000)
Techno-economic feasibility report for installation
of a 20 MW Captive Power Plant (2003)
Techno-economic feasibility report for installation
of 20 MW captive power plant (2003)
Design, engineering and project management
services for installation of a 20 MW captive
power plant (2005)
Project consultancy and engineering services
for implementation of mill development plan
involving 350 tpd pulp mill with ECF bleaching,
chemical recovery system and 16 MW captive
power plant (Ongoing)
Rapid EIA in connection with expansion-cum-modernisation
of the mill (ongoing)
|
|
|
|
Shree Cements
Limited
Engineering and consultancy services, procurement
assistance, project management services and
assistance in construction management for
installation of 2 x 18 MW TG set and along
with 2 x 80 tph boiler for captive power generation
(2003)
Techno-economic feasibility report for installation
of a 6 MW Power plant at Shree Power (for
RAS cement operation) (2004)
Techno-economic feasibility report for installation
of a 2 x 18 MW captive power plant at Bangur
Cement Plant RAS, (2005)
Engineering and consultancy services for
installation of 1 x 18 MW TG set and along
with 1 x 85 tph boiler for captive power plant
(Ongoing)
|
|
|
|
Sinar Mas Pulp
& Paper (India) Limited
Rapid EIA Study for establishment of a 200,000
tpa paper mill to produce specialty papers,
coated papers and coated boards (1995)
Project consultancy services including basic
and detail engineering for the establishment
of a 200,000 tpa paper mill to produce speciality
papers, coated papers and coated boards (1996)
|
|
|
|
Star Paper
Mills Limited
Techno-economic feasibility study for the
Establishment of a captive bagasse pulp mill
(1991)
Technical audit and consultancy services
of a 50,000 tpa integrated pulp and paper
mill (1991)
Techno-economic feasibility report for installation
of co-generation plant (1995)
Design, engineering and consultancy services
for renovation and modernisation of a 50,000
tpa integrated pulp and paper mill (1996)
Mill optimisation and development plan (1998)
|
|
|
|
Tamil Nadu
Newsprint and Papers Limited
Concept to commissioning of this mill in a
record time frame of 36 months from finance
tie-up (1981-1984)
Identification of international R&D facilities;
structuring, co-ordinating and reporting on
the R&D programme for production of mechanical
bagasse pulp and its use in manufacture of
newsprint (R&D trials conducted by Beloit
Corporation, USA and Enso Gutzeit, Finland)
(1982)
Training of operating personnel (including
laboratory chemist/technicians) for 100,000
tpa bagasse based newsprint and fine paper
mill (1984)
Installation of a 1 x 18 MW turbo generator
sets along with 3 x 60 tph ignifluid boilers
– Phase I (1984)
Research on bio-technological applications
in paper industry. Besides general applications
the research effort focused on preservation
of bagasse during storage, wastewater treatment
and slime-control (1987)
Techno-economic feasibility report for establishment
of a large seized bagasse based newsprint/fine
paper mill (Unit # 2) in Tamil Nadu (1995)
Basic engineering support for Vision Finance
and Leasing Ltd, Mumbai for their 125,000
tpa paper project (1995)
Design, engineering, technical services and
project management services for expansion
of the integrated pulp and paper mill from
90,000 tpa to 180,000 tpa (1996)
Installation of a 1 x 10.5 MW turbo generator
sets along with 1 x 60 tph AFBC boiler for
the expansion of the mill hooking up the existing
system – Phase II (1996)
Technical audit and mill development study
of a 180,000 tpa composite mill (1997)
Analysis of catastrophe failure of the turbine,
at one of their c-operative sugar mills (1998)
Detail engineering services for installation
of wet lap machine (1999)
Review of various combustion system and selection
of combustion system for firing solid fuels
viz., coal, lignite, Australian/China coal
(2001)
Installation of 24.62 MW TG set along with
1 x 90 tph AFBC boiler for new cogeneration
plant (2001)
Rapid EIA study in connection with the following:
- Expansion of the mill from 90,000 tpa to
180,00 tpa
- Expansion of the mill to 240,000 tpa
Basic and detail engineering services for
installation of 90 tph FBC boiler and Turbo
generator for co-generation of power (2001)
Due diligence study of Thai Pulp and Paper
Industries in association with Amec, Simons,
Canada (2001)
Techno-economic feasibility report for the
expansion of mill under Mill Development Plan
(2004)
Engineering and consultancy services for
installation of 20 MW TG set (Oongoing)
Engineering of ECF
bagasse and wood pulp mill (On going)
Techno-economic feasibility
study for Paper Machine #3 (On going)
|
|
|
|
West Coast
Paper Mills
Project evaluation study of Titagarh Paper
Mill Unit 1 (2001)
Techno-economic feasibility study for the
establishment of a captive bagasse pulp mill
(1992)
Study on water conservation (2004)
Detailed project report concerning capacity
expansion-cum-technology up gradation of the
mill (ongoing)
Rapid EIA Study for
capacity expansion-cum-technology upgradation
of the mill (ongoing)
|
|
|
|
|
|
|
|
|